Construction and renovation works included overall renovation of the production facilities, warehouses and administrative building. The facades and roofs of all the main blocks were executed by applying thermo panels, the window frame constructions were replaced and the electrical system was renovated.
Suspending ceilings were installed and the flooring was made as polished concrete flooring with special epoxy coating.
The total volume of construction works covered an area of 11150 sq.m and was executed for a period of 14 months.
Investor: Mechatronica S.C.